Finally, we've uploaded a new installation video for a pull-up bar! You can watch the video here and on our klimmzugstangen.de Youtube Channel.
In the video, we visually explain how to install a ceiling-mounted pull-up bar, specifically the D4 model. The process can be directly applied to our wall-mounted models as well. If you find the video helpful, please give us a thumbs up.
In addition to the screws, you'll need the following tools to mount the pull-up bar:
- Tape measure
- Hammer
- Hammer drill with a 10mm drill bit
- Ratchet with a socket and extension
Here are the individual installation steps from the video for you to read through.
- First, find the right position for your pull-up bar.
- Mark and drill the first hole in the masonry - keep in mind that this first hole will determine the position of the pull-up bar.
- Position the pull-up bar and loosely secure it with a hanger bolt, leaving about 5 - 8 mm of play on the other side. The hanger bolt should be pre-assembled with the cap nut and washer before securing.
- Now, mark the other 7 holes with a pencil or permanent marker.
- Now, take down the pull-up bar. To do this, just unscrew the cap nut and leave the hanger bolt in the anchor.
- Now, drill the remaining 7 holes and insert the anchors.
- Now, mount the pull-up bar, starting with the cap nut you already used, and then screw in the remaining 7 hanger bolts.
- Finally, hand-tighten all the cap nuts.
- Done!
If you ever have to move or need to remove the hanger bolts from the ceiling for any other reason, just watch the following video tutorial. In this video, we explain how you can remove any hanger bolt from the wall by locking two nuts against each other.